Abstract:

Access Management

U.S. Highway 90 – Beach Boulevard

No Presentation

Case Study

 

MDOT

Outline

  • Project Purpose

  • Scope of Project

  • Significant Impacts from Katrina

  • Major Impacts to Traffic

 

Summary

  • Coordinated effort with City and MDOT accomplished implementation of many of the Access Management recommendations

  • Improved pedestrian access with 5 ft sidewalks and boardwalk reconstruction added significant recreational/community value

  • While currently development is slowed, eventual redevelopment will not have such an adverse effect as the hundreds of commercial driveways that existed pre-storm. (2008 traffic – 35,000 vpd)

  • Coordinated signals have had a positive effect on commuting traffic

  • Mast arm signals more durable in high wind events and reconstruction is to higher standards

Slide List:

Slide Titles

1. City of Biloxi/MDOT

2. Project Purpose

3. Scope of Project

4. Significant Impacts from Katrina

5. Major Impacts to Traffic

6. Existing Conditions/Data Collection

7. Hwy 90 – Beau Rivage/I-110

8. Hwy 90 – Ocean Club

9. Hwy 90 – Coliseum

10. Hwy 90 – Edgewater Mall

11. Hwy 90 – Edgewater Mall

12. Debuys to Eisenhower

13. Eisenhower to Grande View

14. Grande View to Beauvoir

15. Beauvoir to Broadwater

16. Broadwater to Camellia

17. Camellia to McDonnell

18. McDonnell to Rodenberg

19. 2005 Pre-Storm Traffic Volumes

20. Redevelopment/Reconstruction Plan

21. Planned Area Developments

22. Planned Area Developments

23. Capacity Improvements to Corridor

24. MDOT Reconstruction of Hwy 90

25. 4-Mile Focus Area on Hwy 90

26. MDOT Access Management Criteria

27. Corner Clearance

28. Recommended Throat Lengths

29. Median Policy

30. Major Property Owners

31. Negotiations

32. Implementation

33. Preliminary Access Modifications

34. Debuys-Before

35. Debuys-After

36. Median-After

37. Preliminary Access Modifications

38. Eisenhower Drive

39. Eisenhower Before (Private Dr)

40. Eisenhower-After (Public St)

41. Eisenhower

42. Eisenhower

43. Preliminary Access Modifications

44. Edgewater Mall – Sears (Before)

45. Edgewater Mall – Sears (After)

46. Grande View/Breakers-Before

47. Grande View/Breakers-After

48. Preliminary Access Modifications

49. Preliminary Access Modifications

50. Beauvoir – Before (broken brick)

51. Beauvoir-Construction

52. Beauvoir

53. Beauvoir - After

54. Beauvoir

55. Preliminary Access Modifications

56. Reclaimed MDOT ROW

57. Preliminary Access Modifications

58. Treasure Bay - Before

59. Typical Section

60. Camellia Service Drive - After

61. Veterans-Service Drive (after)

62. Preliminary Access Modifications

63. McDonnell-Service Drive (after)

64. Summary

65. Questions?