Presentation | 2021

Alternative to “Design, Build, Defend”

Traditional engineering would often left the public out of the design process until the very end. This method of “designing, building, and defending” lead to a near cancellation of a grade-separated intersection on State Highway 6 near Houston. Mike Heath, President of Alliance Transportation Group, explains an alternative process that allowed the public to create their own performance metrics and lead to a project which the community felt enrolled in. Presented by Mike Heath at the 2012 National Access Management Conference.

Categories
Techniques
Tags